Field Monitoring
1.0.1
1.0.1
  • Field Monitoring Module Documentation
  • INTRODUCTION
    • Project Background
    • Opportunities
    • Objectives
    • Scope of the Field Monitoring Module
    • Glossary / Terminology
    • FAQ
    • Report an Issue / Contact us
  • PRODUCT / END-USER DOCUMENTATION
    • Overview
    • User Groups
    • User roles and permissions
    • Field Monitoring Module Navigation
    • Overall User Interface
    • Settings
      • Adding and Editing Questions
      • Sites Management
    • Plan
      • Building the Rationale For the Monitoring Activity
      • Logging Known Issues
      • Templating Checklists for Field Monitoring Activities
    • Collect
      • Activities Overview
      • Drafting a Monitoring Activity
      • Checklist / Questionnaire Setup
      • Checklist Review
      • Assigning / Accepting / Rejecting a Visit
      • Data Collection
      • Report Finalization
      • Submission / Completing a Monitoring Activity
    • Analyze section
      • Monitoring Activity
      • Country Overview
  • TECHNICAL DOCUMENTATION
    • Architecture
    • Development Setup
    • Deployment / DevOps
    • Data Model
    • Fixtures and Management Commands
    • Integration with permissions framework
    • API Documentation
      • Error Handling
    • Frontend
      • Module Structure
      • Build Process
    • Offline Collection module
Powered by GitBook
On this page
  1. INTRODUCTION

Glossary / Terminology

The following table includes definitions for any unique symbols or notations that are used in the document.

TERM

DEFINITION

AP (Action Point)

Task that was created and assigned to some individual and aimed to ensure a user can generate follow-up on the particular action which is attributed to a specific module (Third Party Monitoring Module, Financial Assurance Module, Trip Management Module, and Field Monitoring) or not associated with any of eTools Modules (Action Point Dashboard);

CO

Country Office

CP

Country Programme

CP Output

Country Programme Output is as established in results structure in VISION (equivalent to Work Breakdown Structure level 3).

CSO

Civil Society Organization

FM (or Field Monitoring)

As described in the draft “Guidance on a Systematic Approach to UNICEF Field Monitoring”

FO

Field Office

Location

Refers to the geographic areas at different administrative levels (e.g. admin 2, 3 or 4).

Measurement

One of the methodologies for field monitoring

Observation

One of the methodologies for field monitoring

PD/SSFA

Programme Document /Small Scale Funding Agreement

PME

staff member of UNICEF or individual consultant who has edit capabilities to the FM Module and can create a FM visit as well as action points. This user also has super-user access in the action point module to edit any action point not assigned to them;

RAM

Results Assessment Module – This is an on-line system Country Offices use to report against CP Outputs and CP Output Indicators

Section

Section is a working unit established within a Country Office.

Site

Refers to the community level space, neighborhood (area) including facilities/service-points, which is the unit of analysis for a Field Monitoring visit.

TPM

Third Party Monitors

UI

User interface

UNICEF User

Staff member or individual consultant who has a view-only capability to the Field Monitoring Module.

PreviousScope of the Field Monitoring ModuleNextFAQ

Last updated 5 years ago